One merge line for the whole project #

The plan from investigation T-544 (the owner said "ok do it"). It was built in 6 steps (T-546 to T-551), all merged. Later work (T-552) reads this note.

Why #

Before, a task could reach a merge by many paths, each with its own way of waiting. tests.lock made only one task's tests run at a time, but it did not cover the catch-up with main or the move of main. So main could move between a task's tests and its merge, and the task then raced, clashed, or was tested again. Now there is one line, and main can't move during a turn.

The flow as built #

hand-back → prep → checker (if on; runs before the line, runs no project tests) → [ONE MERGE LINE, whole project, shared by all sessions, oldest first] → at its turn, in one go: catch up with main → tests (skipped if this exact tree already passed, T-527) → merge

Only the task at the front merges, so main can't move during a turn. Any failure is one normal failed try. The failures are: tests fail, tests time out, a clash with main, the turn ran over its time, or main was moved by hand during the turn. There is one time limit per turn.

Every way into a merge joins the same line: finishTry/finishWork, approve (mergeFinished/mergeWork), running the tests again by hand, retryFileWaits → mergeWaiting, and restartCheckers → checkerStepAgain (which starts the checker again before the line). The checker (afterChecker, hooks/app/workers.ts) is done before the task joins; there is no second trip through the line after it.

The line #

History: the 6 steps (all merged) #

  1. T-546: the line itself; every way into a merge joins it.
  2. A test time-out became a normal failure (the timed-out-tests rerun was cut).
  3. A clash with main became one normal failed try (the extra conflict tries were cut).
  4. One time limit for the turn (the "ran over before" split was cut).
  5. The race retry was cut; notes and guide tidied.
  6. The checker runs before the task joins the line; its second trip was cut.

Costs #